Dam BuildingPortlethen Moss Local Nature Conservation SitePeatland restoration. Building dams with piling to create ponds and stem the flow of water out of the peatland - keeping the peat wet and alive and storing carbon.Materials requiredPlastic piling sheets 1 metre long approx, 20 sheets or whatever is available.